home liquidation demolition environmental future use tenders health and safety slag contact

Environmental
Design and
Management
Limited

Land Use Plan &
Re-development
Strategy
Contents

 



EDM REPORT - Figures

 

 

  Figure 1.1 Context
  Figure 2.1 Land-Use Zoning
  Figure 2.2 Regional Transportation Issues
  Figure 2.3 Regional Open Space
  Figure 2.4 Regional Infrastructure Issues
  Figure 3.1 Surface Elements 2002, Historical Shorelines
  Figure 3.2 Existing Infrastructure: Water Lines, Sewer Lines, Sprinkler System
  Figure 3.3 Existing Infrastructure: Pipelines & Power Lines
  Figure 3.4 Wharves and Bathymetry
  Figure 4.1 Site Classification Units and Environmental Concerns
  Figure 5.1 Industrial Land Supply Golf and Wharf Locations
  Figure 6.1 Preliminary Concept
  Figure 7.1 Concept



 
next top previous

 
home   |   liquidation   |   demolition   |   environmental   |   future use   |   tenders   |   health & safety   |   contactprivacy